Alicante province
Pool Renovation in Alicante — Refresh Your Pool Without Rebuilding
Pool renovation in Alicante brings tired old Costa Blanca pools back to life without a rebuild. We renew the lining, waterproof the shell, replace pumps and filtration, fit LED lighting, convert to saltwater chlorination and re-lay the surround paving, all with a 2-year guarantee.
Free quote
Same-day response. No obligation.

- Area
- Alicante & province
- Quote
- On request, no obligation
- Guarantee
- 2 years
- Timescale
- Re-lining the shell: 1–2 weeks.
Many coastal pools are now well into their years: the mosaic tiles come away, the shell loses water, the pump runs inefficiently and the colour has faded. Renovating is nearly always better value than rebuilding, because you keep the existing shell and modernise only what is needed.
We repair and waterproof the shell, replace the lining with mosaic tiles, reinforced membrane or microcement, and overhaul the plant room with efficient pumps and up-to-date filtration. We also convert pools to saltwater chlorination — softer water with far fewer chemicals, which bathers much prefer.
We finish the renovation with LED lighting, steps, optional heating and a new surround and coping. We run the whole job through one point of contact with our own in-house team, which suits owners managing the property remotely from abroad.
What's included
Shell lining
Renewal with mosaic tiles, reinforced membrane or microcement to suit the condition and style.
Shell waterproofing
Sealing the pool shell to eliminate water loss and leaks.
Pumps and filtration
Replacement with more efficient, quieter filtration equipment.
LED lighting
Low-energy LED lights, with a colour option, for evening swims.
Saltwater conversion
Fitting a salt chlorinator for softer water and fewer chemicals.
Surround and coping
Renewal of the anti-slip paving and the edge around the pool.
How we work
- 1
Site visit
We check the shell, plant room and surround with no obligation.
- 2
Fixed-price quote
We detail the lining, equipment and timescale in writing.
- 3
Works
Drain, repair, re-line and commission the filtration.
- 4
Handover with guarantee
Refill, start-up and a written 2-year guarantee.
Timescales
- Re-lining the shell: 1–2 weeks.
- Plant-room overhaul and saltwater conversion: 3–6 days.
- Full renovation with new surround paving: 3–5 weeks.
Bespoke quote
Every project is unique: the price fits your job.
We do not use one-size-fits-all price lists. After a free, no-obligation site visit we prepare a detailed personalised quote, with a fixed price agreed before we start.
Before & after


Villa pool re-tiled with mosaic
Santa Pola
New mosaic, LED and salt chlorinator on an 8x4 m pool. Soft water and low running costs.


Community pool with leaks
Orihuela Costa
Shell waterproofed with reinforced membrane and a new pump after years of water loss.
Customer reviews
“The pool looks brand new and with the salt chlorinator upkeep is minimal. Delighted.”
“It had leaked for years. They made it watertight and coordinated everything while I was in the UK.”
Sample reviews — replace with real verified testimonials before going live.
Frequently asked questions
How much does it cost to renovate a pool in Alicante?
The price depends on the size of the shell, the chosen lining, whether the filtration or surround paving needs renewing and the starting condition. Every pool is different, so we fix the price after the site visit. Request a free, no-obligation quote.
Is it better to renovate or build a new pool?
In most cases renovating is better value: you keep the existing shell and modernise only what is needed, with less work and a shorter timescale. We only recommend rebuilding when the shell has serious structural damage, and we tell you honestly on the visit.
What are the benefits of saltwater chlorination?
Saltwater chlorination makes the disinfectant from salt, giving softer water on the skin and eyes and far less handling of chemicals. Day-to-day upkeep is easier. We can convert your traditional chlorine pool to salt as part of the renovation.
How long will the pool be out of use?
A re-lining usually takes one to two weeks, and a full renovation with new surround paving three to five. The exact time depends on the scope and the curing of the materials. We give you a phased schedule in the quote so you know what to expect.
Can you fix a pool that is losing water?
Yes. We trace the leak, repair and waterproof the shell and renew the lining to make it watertight. A pool losing water almost always has damaged lining or joints, which we resolve within the renovation, backed by our 2-year guarantee.
Areas we cover
Related services
Ready for your free, no-obligation quote?
Free site visit and a personalised quote. Same-day response.