Alicante province
Flooring Installation in Alicante — Wood, Porcelain & Vinyl, Fixed-Price
Flooring installation in Alicante is the fastest way to transform a home: we fit laminate and engineered wood, porcelain tiles and waterproof SPC vinyl, including removing the old floor, levelling and new skirting. We work to a fixed price, with our own team and a 2-year guarantee across the Costa Blanca.
Free quote
Same-day response. No obligation.

- Area
- Alicante & province
- Quote
- On request, no obligation
- Guarantee
- 2 years
- Timescale
- Two-bed home (laminate over existing floor): 2–4 days.
Replacing the flooring throughout a property is the renovation that changes it most for the least disruption. We swap tired or dated floors for AC5 laminate, engineered wood, rectified porcelain or SPC vinyl, matched to how each room is used and to your budget.
Before we lay anything we check the subfloor is level and, where needed, apply self-levelling compound so the new floor sits perfectly. When the existing tiles are sound, we can often lay straight over them with no demolition — that means far less dust, rubble and fewer days on site.
On the Costa Blanca we choose finishes that stay stable in heat and humidity: SPC vinyl and porcelain will not warp when a holiday home is shut up for months and temperatures swing, which matters in seafront apartments. For overseas owners we coordinate remotely and send photo updates at each stage.
Flooring Installation in Alicante: what's included
Old floor removal
We lift and remove the existing floor and clear the rubble whenever demolition is needed.
Self-levelling preparation
We correct uneven subfloors with self-levelling compound for a finish with no lips or ridges.
Laminate and engineered wood
AC4/AC5 laminate and engineered wood flooring fitted with tight, minimised joints.
Rectified porcelain tiles
Large-format porcelain laid with fine joints, ideal for wet areas and high-traffic zones.
Vinyl and SPC click flooring
Waterproof SPC vinyl that is quiet underfoot and stable against heat and humidity.
Skirting and trims
New skirting, transition profiles and sealing at doorways and terrace thresholds.
The full scope of Flooring Installation works
Every job we take on within this service, with the detail of how we carry it out. The price is always fixed after the survey.
Subfloor preparation
Old floor removal
- What we do
- Lifting the existing tiles, terrazzo or wood floor and taking the rubble to a licensed tip.
- How we do it
- We break out with an electric breaker and extraction at the tool, so the dust does not travel through the rest of the property. Rubble goes out in bags the same day; in blocks we agree working hours and protect the lift and entrance hall.
Self-levelling preparation
- What we do
- Correcting dips and ridges in the screed before the new floor goes down.
- How we do it
- We vacuum, prime the screed and pour self-levelling compound until it sits within 3mm under a 2m straightedge — the tolerance laminate and large-format tiles need if you want no lippage and no open joints.
Subfloor moisture testing
- What we do
- Checking residual moisture in the base before laying wood or vinyl.
- How we do it
- We test with a hygrometer. If the reading is high — common in ground-floor flats and homes shut up for months near the sea — we fit a vapour barrier or wait, because laying over a damp screed ends in a buckled floor.
Laying over the existing floor
- What we do
- Fitting the new floor straight over the old tiles with no demolition.
- How we do it
- We go over the floor with a rubber mallet: if nothing sounds hollow and levels allow, we lay on top and adjust the doors to the new height. It saves days of rubble and dust in an occupied home.
Acoustic underlay
- What we do
- The layer beneath laminate or vinyl that softens footfall noise.
- How we do it
- We roll out polyethylene sheet or a fibre underlay to suit the system, with the laps taped. In flats this is what prevents the impact noise that ends in a complaint from the neighbour below and at the residents association.
Laying the floor
AC4/AC5 laminate
- What we do
- Click-system floating laminate in bedrooms, living rooms and hallways.
- How we do it
- We set out the plank direction with the light from the window and stagger the end joints. We leave a 10mm perimeter expansion gap — essential so the floor can move with the heat instead of lifting in the middle.
Engineered wood
- What we do
- Real wood flooring on a multi-layer core, laid floating or glued down.
- How we do it
- We acclimatise the boxes inside the property for 48–72 hours so the timber settles to the actual humidity of the flat. We glue to the base where you want a solid feel underfoot and less hollow sound.
Rectified porcelain
- What we do
- Porcelain floor tiles, large format included, laid with fine joints.
- How we do it
- Back-buttering and levelling clips on the big pieces, set out from the centre line of the room so the cuts are shared out rather than leaving a thin sliver against the wall you walk in at.
SPC click vinyl
- What we do
- Rigid-core vinyl flooring — waterproof and dimensionally stable.
- How we do it
- This is what we recommend for holiday homes closed up for months: the SPC core barely moves with the temperature swings, unlike laminate. It floats over a thin underlay and takes water without complaint.
Bathroom and kitchen floors
- What we do
- Flooring in wet areas, coordinated with sanitaryware and units.
- How we do it
- We either carry the material through or switch to porcelain depending on use, and seal the perimeter with neutral silicone rather than timber skirting — which is exactly what swells when it gets wet.
Skirting, transitions and trims
New skirting
- What we do
- Lacquered MDF, timber or matched skirting fitted throughout.
- How we do it
- We mitre the corners and fix with adhesive and hidden pins, covering the expansion gap without blocking it: the skirting fixes to the wall, never to the floating floor.
Transition profiles
- What we do
- Junctions between rooms or between two different materials.
- How we do it
- We fit a T-bar or aluminium ramp depending on the step. Across wide openings and large areas we leave an intermediate expansion joint — the thing that stops the floor lifting at the height of summer.
Door adjustment
- What we do
- Trimming door leaves when the new floor raises the level.
- How we do it
- We take the leaf off, trim it with a guide and seal the cut edge so it cannot soak up moisture. We leave enough clearance for the door to sweep over a rug or mat without catching.
Terrace threshold
- What we do
- The junction between the interior floor and the terrace or porch.
- How we do it
- We seal the threshold with a profile and UV-resistant polyurethane mastic: it is the point where water gets in during the heavy autumn rains on the Costa Blanca.
Junctions with units and kitchens
- What we do
- Trims against kitchen plinths, fitted wardrobes and radiators.
- How we do it
- We cut to the plinth and seal, rather than running the floor underneath the units — so a future kitchen change does not mean lifting the floor across the whole room.
Special cases and handover
Staircase treads
- What we do
- Treads and risers finished to match the flooring on each level.
- How we do it
- We use a stair-nosing profile in the same decor with an anti-slip strip on the edge. We work top down so the staircase stays usable at the end of every day.
Terrace and roof-terrace floors
- What we do
- Anti-slip external flooring over a waterproofed base.
- How we do it
- Anti-slip porcelain in flexible adhesive with a wide joint, respecting the fall to the drain. We never lay laminate or vinyl outdoors: the sun here destroys it within one season.
Wood over underfloor heating
- What we do
- Installation compatible with underfloor heating — rare here, but found in new-builds.
- How we do it
- We choose a low thermal-resistance board and a conductive underlay, and insist the system has completed its commissioning cycle before we lay. Skip that and the timber moves afterwards and opens the joints.
Repairing damaged boards
- What we do
- Replacing individual planks that have swollen, scratched or lifted.
- How we do it
- We either unclip back from the nearest wall run or cut out and bond the piece in, depending on the case. That is why we always leave spare boxes from the same batch: the decor shifts between batches.
Final clean and spare material
- What we do
- The floor handed over clean, offcuts removed and the surplus labelled.
- How we do it
- We sweep, vacuum and give it a first clean with a product suited to the floor. Spare boxes are left labelled with the batch, and we send handover photos if you are not living here.
Flooring Installation in Alicante step by step: how we work
- 1
Site visit
We measure, check the subfloor and help you choose the flooring.
- 2
Fixed-price quote
We set out material, m² and timescale in a written fixed price.
- 3
Installation
We remove, level and fit the floor with our own in-house team.
- 4
Handover with guarantee
Final clean, trims and a 2-year guarantee on the installation.
Timescales for Flooring Installation in Alicante
- Two-bed home (laminate over existing floor): 2–4 days.
- Full apartment with removal and levelling: 1–2 weeks.
- Porcelain throughout: 1.5–3 weeks depending on format.
Pricing your Flooring Installation in Alicante: how we quote
Every project is unique: the price fits your job.
We do not use one-size-fits-all price lists. After a free, no-obligation site visit we prepare a detailed personalised quote, with a fixed price agreed before we start.
Flooring Installation in Alicante: before & after


Laminate throughout
San Juan
Dated tiles replaced with AC5 laminate over 80 m², fitted in 3 days with no demolition.


Large-format porcelain
El Campello
Switch to 120x60 rectified porcelain with levelling in a beachfront apartment.
Flooring Installation: customer reviews in Alicante
“Professional approach to renovation and construction services. The communication is clear, the team pays attention to details, and the overall presentation gives a good impression of reliability and quality.”
“A very good professional service with a strong focus on the customer. Communication was clear and all questions were handled quickly. Overall, I had a very positive experience and would be happy to recommend Renixo.”
“Дякую за прекрасну роботу та виконання мого замовлення.”
Flooring Installation: frequently asked questions in Alicante
How much does it cost to replace the flooring in a flat in Alicante?
The price depends on the square metres, the type of floor you choose (laminate, porcelain or vinyl), whether the old floor must be removed and levelled, and the condition of the subfloor. Every home is different, so we fix the price after the visit. Request a free, no-obligation quote.
Can you lay new flooring over the existing tiles?
Yes, in many cases. If the existing floor is firm, level and free of damp, we lay laminate or vinyl straight over it. That avoids demolition, cuts dust and rubble and shortens the timescale. At the site visit we confirm whether it is viable in your property.
Which flooring is best for the Costa Blanca?
For holiday homes and coastal properties we recommend porcelain or SPC vinyl, as they cope with heat, humidity and temperature swings without warping. Laminate is an excellent choice for bedrooms and living rooms in regular use. We advise room by room based on how you use the home.
How long does it take to re-floor a whole home?
Laying laminate over an existing floor in a two-bedroom flat usually takes 2 to 4 days. If the old floor has to come up, with levelling and porcelain tiling, it extends to one or two weeks. We give you a firm completion date in the quote.
Do you handle furniture and skirting?
The quote includes new skirting, transition profiles and all trims. Moving and protecting furniture is arranged with you and we can take care of it ourselves; it is itemised and priced within the fixed quote so there are no surprises later.
Flooring Installation: the areas we cover
Services related to Flooring Installation
Ready for your free, no-obligation quote?
Free site visit and a personalised quote. Same-day response.