Alicante province
Plumbing & Electrical in Alicante — Full Re-Pipe and Re-Wire
We fully renew the plumbing and electrics of your Alicante property: a complete re-pipe of the water and waste system, a new consumer unit and circuits, and all the certificates you need. In-house team, a 2-year guarantee and coverage across the Costa Blanca.
Free quote
Same-day response. No obligation.

- Area
- Alicante & province
- Quote
- On request, no obligation
- Guarantee
- 2 years
- Timescale
- Full re-wire of a flat: 4–7 days.
Many 1970s, 80s and 90s flats on the Costa Blanca still run on their original services: iron or lead pipes that leak and lose pressure, and old fuse boards with no RCDs or earthing that no longer meet current Spanish regulations. This is not a quick repair — it is a full re-pipe and re-wire that brings the whole property up to standard and makes it safe.
For plumbing we replace the pipework throughout the home with multilayer or cross-linked polyethylene pipe, renew stopcocks, waste and drainage, and prepare the feeds for kitchen and bathrooms. For electrics we fit a new consumer unit with main switch and RCDs, run separate circuits for every room and install the sockets and switches.
On completion we issue the electrical certificate (boletín) and, where relevant, the plumbing certificate, plus a plan of the runs. We coordinate both trades together so the chasing, making good and tiling are done once — and you deal with a single team rather than chasing separate installers.
What's included
Complete water re-pipe
The entire plumbing installation replaced with concealed multilayer or cross-linked polyethylene pipe with no exposed joints.
New consumer unit
A new board with main switch, RCDs and circuit breakers per circuit, wired to current Spanish electrical regulations.
New circuits and sockets
Dedicated wiring for kitchen, bathrooms, air conditioning and living areas, with ample sockets and lighting points.
Waste and drainage
Renewal of soil stacks, traps and waste runs to end blockages, smells and hidden leaks.
Earthing and protection
New or upgraded earthing and protection against overloads and electric shock.
Certificates
Electrical certificate and plumbing certificate issued for the meter connection or power upgrade.
How we work
- 1
Site visit
We inspect the existing services and scope the work with no obligation.
- 2
Fixed-price quote
We itemise the plumbing and electrical work and timescale in a fixed price.
- 3
Installation
We re-pipe and re-wire, coordinating both trades at the same time.
- 4
Handover with guarantee
We test everything, hand over the certificates and a 2-year guarantee.
Timescales
- Full re-wire of a flat: 4–7 days.
- Full re-pipe of a flat: 3–6 days.
- Combined re-pipe and re-wire within a renovation: 1–2 weeks.
Bespoke quote
Every project is unique: the price fits your job.
We do not use one-size-fits-all price lists. After a free, no-obligation site visit we prepare a detailed personalised quote, with a fixed price agreed before we start.
Before & after


Full services renewal
Benidorm
An 1980s flat with iron pipe and a board with no RCDs: complete re-pipe and re-wire with fresh certificates.


New board and circuits
Alicante centre
Obsolete consumer unit and all wiring replaced in an older flat, with proper earthing and protection.
Customer reviews
“They replaced all the pipework and the board in a week. No more pressure drops or tripping breakers, and they sent photos as they went.”
“Both trades coordinated together and they handled all the certificates for us. We arranged it all from abroad.”
Sample reviews — replace with real verified testimonials before going live.
Frequently asked questions
How much does it cost to re-pipe and re-wire a flat?
It depends on the size of the property, the number of bathrooms and rooms, whether walls need chasing or there are false ceilings, and the condition of the board and pipework. Every case is different, so we fix the price after the survey. Request a free, no-obligation personalised quote.
Do I really need a full re-wire, or just repairs?
In homes built between the 1970s and 90s a full renewal usually makes sense: patch repairs on old pipe or an obsolete board simply fail again and do not meet current regulations. After the visit we tell you honestly what your property actually needs.
Do you issue the certificate to connect the electricity?
Yes. When the electrical work is finished we issue the boletín (electrical installation certificate) that the supply company requires to connect the meter or increase power, plus a plumbing certificate where relevant. You receive everything ready to arrange the supply.
Can I stay in the property during the work?
Often yes, working room by room and restoring water and power at the end of each day. If the renewal is complete and simultaneous there will be short cuts to services; we tell you in advance so you can plan around them, which matters if you coordinate remotely.
Is the work guaranteed?
Yes. All the plumbing and electrical work we renew carries a 2-year guarantee on materials and labour, in addition to the manufacturers guarantees on the components installed. You receive it in writing on handover.
Areas we cover
Related services
Ready for your free, no-obligation quote?
Free site visit and a personalised quote. Same-day response.