Alicante province
Pool Renovation in Jávea — Full Refurbishment, 2-Year Guarantee
We renovate pools in Jávea (Xàbia) from top to bottom: we renew shells worn by sun and heat, replace tiling and reinforced liners, upgrade the plant to saltwater chlorination and low-consumption pumps, and refresh the terrace surround. Our own team works to a fixed price with a 2-year guarantee across the Costa Blanca.
Free quote
Same-day response. No obligation.

- Area
- Alicante & province
- Quote
- On request, no obligation
- Guarantee
- 2 years
- Timescale
- Tiling or reinforced liner replacement: 1–2 weeks.
The villas around Montgó and the Arenal have pools that, after years of intense sun and heat, show loose tiling, faded reinforced liners and cracked copings. In Jávea we refurbish the shell in full: we strip out whatever no longer holds, repair the structure, re-waterproof and choose a finish built to last against the coastal glare.
A renovation is the ideal moment to modernise the plant room. We replace tired filtration with saltwater chlorination, which lowers maintenance and is kinder to the skin, and fit variable-speed pumps with scheduling that noticeably cut electricity use — a real benefit in Jávea villas where the pool runs much of the year.
For overseas owners we manage the whole project remotely: we agree the finish and equipment by email and video call and send photo reports at each stage, so you can renovate your Jávea pool without flying over. The terrace, coping and non-slip surround are part of the job, so the pool and its surroundings come together as one.
What's included
Shell refurbishment
Strip-out and structural repair of the pool shell to leave a sound base before finishing.
New tiling or reinforced liner
Loose tiling or faded liner replaced with materials that resist the coastal sun.
Full waterproofing
A complete waterproof treatment to stop water loss and leaks into the ground.
Saltwater chlorination
Conversion to salt for a softer swim and far easier day-to-day upkeep.
Energy-efficient pumps
Variable-speed pumps with scheduling to bring the electricity bill down.
Terrace and coping
Renewal of the non-slip surround and coping around the pool.
How we work
- 1
Site visit
We assess the shell and plant at the villa, in person or by video, with no obligation.
- 2
Fixed-price quote
We choose the finish and equipment and fix the price and timescale in writing.
- 3
Renovation
Our own team renews the shell, plant and terrace, sending photo updates.
- 4
Handover with guarantee
We fill, commission the plant and hand over with a 2-year guarantee.
Timescales
- Tiling or reinforced liner replacement: 1–2 weeks.
- Full shell refurbishment with new plant: 3–4 weeks.
- Terrace and coping renewal: 1–2 weeks.
Bespoke quote
Every project is unique: the price fits your job.
We do not use one-size-fits-all price lists. After a free, no-obligation site visit we prepare a detailed personalised quote, with a fixed price agreed before we start.
Before & after


Villa pool near Montgó
Montgó
Loose tiling replaced, re-waterproofed and converted to salt on a villa in full sun all day.


Pool and terrace in the Arenal
Arenal
Shell renewed with a reinforced liner, low-consumption pump and a new non-slip surround.
Customer reviews
“The tiling was falling off and they made the shell like new, plus salt. The difference in maintenance is huge.”
“They changed the liner and pump and renewed the terrace. The electricity bill dropped and it all looks beautiful.”
Sample reviews — replace with real verified testimonials before going live.
Frequently asked questions
How much does a pool renovation cost in Jávea?
The price depends on the size of the shell, the finish chosen, whether you convert to salt and the extent of the terrace work. Every pool around Montgó or the Arenal starts from a different condition, so we fix the price after the site visit. Request a free, no-obligation quote through the form.
Why does tiling fail sooner on Jávea villa pools?
The intense sun and coastal heat in Jávea are hard on finishes and reinforced liners, which fade and lift over the years. That is why, when we renovate, we choose tiling and materials designed to withstand solar radiation and extend the life of the shell.
Is it worth switching to saltwater chlorination?
For most Jávea pools, yes. Saltwater chlorination gives a softer swim for skin and eyes and greatly reduces daily upkeep, as the system generates the disinfectant from salt. We assess it with you based on how much the pool is used.
Do the new pumps really lower the bill?
Yes. Variable-speed pumps with scheduling use considerably less than old single-speed units, especially in villas where filtration runs for many hours. It is one of the upgrades you notice soonest, particularly if the pool operates much of the year.
Can you manage the renovation if I live abroad?
Yes. Many of our clients are overseas owners in Jávea. We agree the finish and equipment by email and video call, send photo updates at each stage and commission remotely, so you can renovate your pool without travelling to the Costa Blanca.
Areas we cover
Related services
Ready for your free, no-obligation quote?
Free site visit and a personalised quote. Same-day response.